Images are in chronological order
Scroll over
image for details
Click on any image to enlarge
April 2nd 2018
Temporary control panel
The first two switches on the bottom left are for cab control between tracks one and two on the twin controller; the third switch is for the walk about controller which can be flipped for track one or track two.
April 29th 2018
Above the control panel distribution board has been relocated underneath the layout.
Right: New cab and remote control panel set onto the fascia of the layout. (a proper fascia will be fitted and painted, the control panel will be a fixed to it). The two controllers still sit on the workbench as in the first photo.
2019
March. Schematic switch panel for South Yard
The first two switches on the bottom left are for cab control between tracks one and two on the twin controller; the third switch is for the walk about controller which can be flipped for track one or track two.
April 29th 2018
Above the control panel distribution board has been relocated underneath the layout.
Right: New cab and remote control panel set onto the fascia of the layout. (a proper fascia will be fitted and painted, the control panel will be a fixed to it). The two controllers still sit on the workbench as in the first photo.
2019
March. Schematic switch panel for South Yard
No comments:
Post a Comment